NORCAN philosophy and principles focused on Quality First for Total Customers Satisfaction. NORCAN has deployed strict processes through its Detailed Work Instruction Manual (DWIM) for all turbines and components manufactured by NORCAN or sourced from ISO Compliant Certified Third Parties. They must be assembled at the NORCAN workshop first for fit and finish following Quality Policy, ED&I, and the HSE Policy for QA-QC-QMS for ISO compliances. Workshop compliance is necessary to avoid any risks of delays or non-compliance during the installation or commissioning on site. The process of in-house assembly allows NORCAN to carry all FAT Tests witnessed by customers. The same principles are an inclusive part of the unit(s) commissioning or complete W2W on-site.
Shop Assembly for Fit and Finish, the most critical element to compliance , best in class quality made and assembled in Canada, on-time delivery during installation and commissioning. NORCAN is 100% Fully Committed to Total Customers Satisfaction!
The best example of Shop Assembly for Fit and Finish are these two sets of photos placeholder, on the left NORCAN 4 MW FRANCIS Camelback (NORCAN manufactured and delivered two identical units for the same site total 12 MW of installed capacity) during Shop Assembly at NORCAN workshop in Carleton Place Ontario for Fit and Finish for QA-QC-QMS-DWIM-ISO Compliances. The right photo placeholder is the same NORCAN 4 MW FRANCIS Camelback inside the powerhouse hull. One can only imagine the risks of non-compliance issues arising during installation in such a tight space, including lifting and lowering challenges.
NORCAN is your proven One Strong Team for your modernization project, or brand new greenfield project, One-Stop Provider, One-Point of Contact delivering results with State-of-the-Art, Best-in-Class Quality made in Canada, and After-Sales Services for total customer satisfaction.