NORCAN Short Survey of Installed Projects with Turbines Types

FRANCIS Conventional

Otter Creek Proctor Sutherland Falls unit 1, 2, 3, 4 - 7.4 MW, Vermont. Low Impact Hydropower Institute Certificate #128

Modernization of the existing powerhouse development built-in 1905 with 3 x new NORCAN FRANCIS Vertical 1711 kW 514.3 RPM ∅ 35-in (898 mm) Turbine, Generators supply, plus 1 x new NORCAN FRANCIS Vertical runner with shaft and new distributor 2173 KW 360 RPM 39.94-in (1014-mm) delivering more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of Turbines, supply of Balance of Plant, Generators, W2W, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A. Breaking News In January 2021, the Green Mountain Power (GMP) Otter Creek Proctor Sutherland Falls project 7.4 MW, Vermont, was awarded a Low Impact Hydropower Institute certificate number 128. NORCAN is privileged, proud, and honored to have been part of this significant sustainable project modernization with NORCAN high-performance generating units ensuring decades of sustainable dependable operations. In addition, the LIHI certificate exemplifies that Green Mountain Power is a proven good steward of the environment and demonstrates that hydropower is an essential part of mitigating climate change and supporting climate resilience.

Marshfield 5.2 MW, Vermont. Low Impact Hydropower Institute Certificate #77

5.2 MW 1 x new FRANCIS Vertical runner 5200 kW 600 RPM ∅ 34-in (864 mm) Runner replacement with NORCAN engineering with modern hydraulic geometries for more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D Reverse Engineering, Manufacturing, Fabrication of the Turbine runner, supply, dismantling, installation and commissioning, Best quality made in Canada with core components sourced in Canada and the U.S.A. The Winooski Hydroelectric Company project of 5.2 MW, Vermont, was awarded a Low Impact Hydropower Institute certificate #77. NORCAN is privileged, proud, and honored to have been part of this significant sustainable project modernization with NORCAN high-performance generating units ensuring decades of sustainable dependable operations. In addition, the LIHI certificate exemplifies that Winooski Hydroelectric Company is a proven good steward of the environment and demonstrates that hydropower is an essential part of mitigating climate change and supporting climate resilience.

Waterbury 5.8 MW, Vermont. Low Impact Hydropower Institute Certificate #148

5.8 MW NORCAN 1 x FRANCIS Vertical 5800 kW 327 RPM ∅ 56.11-in (1430-mm) Runner replacement with NORCAN modern hydraulic geometries for more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D Reverse Engineering, Manufacturing, Fabrication of the Turbine runner, supply, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A. Breaking News in November 2018, the Green Mountain Power (GMP) Waterbury project 5.8 MW, was awarded a Low Impact Hydropower Institute certificate number 148. NORCAN is privileged, proud, and honored to have been part of this significant sustainable project modernization with NORCAN high-performance generating units ensuring decades of sustainable dependable operations. In addition, the LIHI certificate exemplifies that Green Mountain Power is a proven good steward of the environment and demonstrates that hydropower is an essential part of mitigating climate change and supporting climate resilience.

FRANCIS Turbine Camelback

Otter Creek Huntington Falls 2.5 MW, Vermont. Low Impact Hydropower Institute Certificate #128

NORCAN completed the successful design, engineering, manufacturing of the 2.5 MW Installed Capacity modernization of a Brownfield project with 2 x new NORCAN FRANCIS Camelback 1200 kW + 1320 kW 300 RPM ∅ 40.63-in (1032 mm). Turbine with NORCAN Exclusive Wicket Gates regulation with enhanced casing geometries for top efficiencies, Generators supply delivering more power output increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of Turbines, supply of Balance of Plant, Generators, W2W, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A. Breaking News in January 2021, the Green Mountain Power (GMP) Otter Creek Huntington Falls project of 2.5 MW, Vermont, was awarded a Low Impact Hydropower Institute certificate number 128. NORCAN is privileged, proud, and honored to have been part of this significant sustainable project modernization with NORCAN high-performance generating units ensuring decades of sustainable dependable operations. In addition, the LIHI certificate exemplifies that Green Mountain Power is a proven good steward of the environment and demonstrates that hydropower is an essential part of mitigating climate change and supporting climate resilience.

Beldens G2 - 1.1 MW, Vermont. Low Impact Hydropower Institute Certificate #128

Modernization with 1 x new NORCAN FRANCIS Camelback with Wicket Gates regulation runners Ø 41-in (1040-mm) 300 RPM 1150 kW with NORCAN modern hydraulic geometries for more power output with NORCAN Exclusive Wicket Gates regulation with enhanced casing geometries for top efficiencies significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of the Turbine, dismantling, installation and commissioning, Best quality made in Canada with core components sourced in Canada and the U.S.A. Breaking News In January 2021, the Green Mountain Power (GMP) Otter Creek Belden Falls project 1.1 MW, Vermont, was awarded a Low Impact Hydropower Institute certificate number 128. NORCAN is privileged, proud, and honored to have been part of this significant sustainable project modernization with NORCAN high-performance generating units ensuring decades of sustainable dependable operations. In addition, the LIHI certificate exemplifies that Green Mountain Power is a proven good steward of the environment and demonstrates that hydropower is an essential part of mitigating climate change and supporting climate resilience.

FRANCIS Twin Runners Double Discharge

Carver Falls 1.6 MW, Vermont

Modernization with 1 x new NORCAN FRANCIS Twin Double Discharge Ø 26.5-in (673-mm) 600 RPM 1600 kW with NORCAN modern hydraulic geometries for more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of the Turbine, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A.

Vergennes 9 - 0.9 MW, Vermont

Turbine modernization with 1 x new NORCAN FRANCIS Twin Double Discharge Ø 39.37-in (1000-mm) 300 RPM 900 kW with NORCAN modern hydraulic geometries for more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of the Turbine, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A.

Essex 19 - 0.87 MW, Vermont

Complete power plant modernization W2W, replacement of two existing horizontal Francis with 1 x new NORCAN FRANCIS Twin Double Discharge Ø 29.5-in (750-mm) 450 RPM 0.87MW with NORCAN modern hydraulic geometries more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of supply Engineering, R&D, Manufacturing, Fabrication of the Turbine, supply of the Generator, dismantling, installation and commissioning, best quality made in Canada with core components sourced in Canada and the U.S.A.

KAPLAN Vertical Double Regulation

Peterson Dam 6.35 MW, Vermont

Modernization with NORCAN KAPLAN vertical double regulated new runner and Wicket Gates replacement diameter 2648-mm / 104.25-in. 6345 kW with NORCAN modern hydraulic geometries for more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of work included engineering, R&D, Design, Project Management, Manufacturing of the Runners and Wicket Gates, Dismantling, Installation, and Commissioning with State-of-the-Art best quality made in Canada with core components sourced in Canada and the U.S.A.`

Clark Falls 3.0 MW, Vermont

Brownfield Project runner replacement 1 x NORCAN KAPLAN Vertical Double Regulation Ø 85-in (2160-mm) 240 RPM 3.0MW with NORCAN turbine delivering more power output significantly increasing the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of work included engineering, R&D, Design, Project Management, Manufacturing of the Turbine and Wicket Gates, Dismantling, Installation, and Commissioning with best quality made in Canada with core components sourced in Canada and the U.S.A.

Propeller to KAPLAN Vertical Double Regulations

Gorge 18 - 4.0 MW, Vermont 22.7% gain in Power Output

Old Propeller turbine to NORCAN KAPLAN turbine conversion with Double Regulation Plant Modernization. From Concept to Operations, NORCAN is a Leader of Expert Solution Provider, from Engineering, R&D, Manufacturing, dismantling the old unit in conjunction with a new turbine to minimize downtime, Installation, Commissioning with on-time delivery. 1 x 3.4MW to 4.0 MW, diameter of 2921-mm / 115.00-in, 180 RPM, a 22.7% gain in power output with a significant increase in the annual energy production for a sustainable future supporting building climate resilience while maximizing the power plant revenue for decades of dependable operations. NORCAN scope of work included engineering, R&D, Design, Project Management, Manufacturing of the Runners and Wicket Gates, Dismantling, Installation, and Commissioning. NORCAN is the Solutions Provider of choice in hydropower plant modernization with modern hydraulic geometries, state-of-the-art technology, and best-in-class quality made in Canada.