NEWS

Wicket Gates Replacement

For this project we were responsible for the supply of twenty-two wicket gates (two spares), pins, bolts and transfer links.  This included on-site inspection to ensure alignment of turbine and the alignment in relation to the powerhouse, condition assessment, disassembly, reverse engineering, installation, and commissioning.