Lima, Peru
Tuesday, December 01, 2020
en-CAes-ES

Project Details

Turbine: Double Pelton
Location: Lima, Peru

Description: Upgrade of four runners
Diameter: 1.88M (74")
Net Head: 213M (699 feet)
Speed: 300 RPM
Output: 3.9 MW

Project Images

     
     
Copyright (c) 2020 Norcan Hydraulic Turbine Inc.