Essex, VT
Tuesday, June 22, 2021
en-CAes-ES

Project Details

Turbine: Double Discharge Francis
Location: Essex, Vermont, USA

Description: New Turbine and Generator
Diameter: 750 mm (29.5")
Net Head: 17.38M (57 feet)
Speed: 450 RPM
Output: 874 kW

Project Images

     
     
Copyright (c) 2021 Norcan Hydraulic Turbine Inc.